INTERIM REPORT NO. 2, JANUARY 1963 THROUGH JUNE 1964.
Abstract
The progress of the Long-Range Seismic Measurements Program (LRSM) during the period 1 January 1963 through 30 June 1964 is described. The administrative and technical information is categorized according to routine operations, evaluation of instruments and equipment, evaluation of seismograms, equipment modifications, and data processing. Section 2 contains a summary of the material contained in the report. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1966
- Accession Number
- AD0803201
Entities
People
- Darrell C. Rasmussen
Organizations
- Geotech Instruments (United States)