ENGINE PROPOSAL FOR PHASE 3 OF THE SUPERSONIC TRANSPORT DEVELOPMENT PROGRAM. VOLUME 5. MANAGEMENT AND MANUFACTURING. REPORT H - DETAIL WORK PLAN
Abstract
This report presents a description of the total effort to be accomplished in the design, development, prototype delivery and operational support of the Pratt and Whitney Aircraft JTF17 engine during Phase 3 of the Supersonic Transport Engine Program. This total effort includes: Engine and component development; Management controls and product assurance; and Delivery and product support. The material is presented in relation to the Level 3 areas of the work breakdown structure with each Level 3 area providing an activity description, milestone chart and network chart, including an event dictionary for each network chart. For those areas where a network is inappropriate, only a schedule is presented. The Level 3 areas of the work breakdown structure are described in the Work Statement in Volume 6.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1966
- Accession Number
- AD0804523
Entities
Organizations
- Pratt & Whitney