SUPERSONIC TRANSPORT DEVELOPMENT PROGRAM. PHASE III PROPOSAL. BOEING MODEL 2707. VOLUME VI-2. COST BASELINE REPORT - COST SUPPORT DATA,

Abstract

Contents: Program Information; Cost Summaries; Engineering Labor; Developmental Labor; Developmental Material; Tooling Labor; Tooling Material; Production Labor; Production Material; Purchased Equipment; Subcontracted Effort; Tool and Production Planning; Quality Control Labor; Direct Charges; and Labor and Overhead Rates.

Document Details

Document Type
Technical Report
Publication Date
Sep 06, 1966
Accession Number
AD0804762

Entities

People

  • R. E. Erickson

Organizations

  • Boeing

Tags

DTIC Thesaurus Topics

  • Engineering
  • Materials
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Planning
  • Quality Control
  • Supersonic Transport Aircraft
  • Transport Ships
  • Vehicle Equipment
  • Vehicles

Readers

  • Aerospace Engineering
  • Manufacturing Engineering.
  • Systems Analysis and Design

Technology Areas

  • Hypersonics