PULSE COMPRESSION TUBES.
Abstract
Effort was devoted to finalizing stripline circuits, evaluating vendor items, and adjusting the system to meet the limited funds available. Utilizing the presently available funds will permit the assembly of 16 of the 128 taps orginally planned. These 16 taps will be construction in blocks of 8, as originally planned, to prove the effectiveness of the delay line time-sharing technique. If the performance of the 16-tap unit is satisfactory, the remainder of the system can be readily added when additional funding is available. Design during this quarter was devoted to finalizing a reliable, reproducible coding network and stripline delay trimmer. A preliminary study was made of phase equalizers, but is is felt that they will not be necessary in the delay chain. All major components required in the 16-tap system have been ordered, including the chain amplifiers. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1967
- Accession Number
- AD0807411
Entities
People
- Earl R. Wingrove Jr.
- Hugh W. Hadley
Organizations
- General Electric