ORBITAL FUEL CELL.
Abstract
The second quarter of the program was primarily devoted to the Design and Development phase of the contract. The work remaining on the Study phase of the contract was completed during October 1966. The results of the subsystem studies were coordinated and integrated into an effective system configuration and a preliminary system schematic was formulated to serve as a guide for the design and development effort. An Orbital Fuel Cell System Description report was prepared and will continually be revised as changes evolve from the design and development work. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1967
- Accession Number
- AD0808655
Entities
People
- R. J. Chesner