PRODUCTION ENGINEERING MEASURE FOR SUBMINIATURE HIGH RELIABILITY CERAMIC CAPACITORS.

Abstract

Production runs have been completed through Final Electrical Test. A revised schedule for completion of the four production lots is given. It is expected that this revision will not affect the scheduled startup of qualification testing because the schedule calls for completion of the production lots by June 1, 1967 and qualification testing will not begin until July 1967. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1967
Accession Number
AD0815227

Entities

People

  • C. W. Doran
  • M. Geroulo

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Ceramic Capacitors
  • Engineering
  • High Reliability
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Qualifications
  • Reliability

Readers

  • Software Engineering