POTOMAC RIVER BASIN REPORT. VOLUME III. APPENDIX A - AUTHORITY. APPENDIX B - DIGEST OF PUBLIC HEARINGS. APPENDIX C - DESCRIPTIONS OF ALTERNATIVE PROJECTS.

Abstract

Contents: Preliminary hearings; Hearing on recommendations; Project data; Major construction quantities; Costs; Economic comparisons; Real Estate requirements; and Flood damages.

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1963
Accession Number
AD0818239

Entities

Organizations

  • Baltimore District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Construction
  • Drainage Basins
  • Flood Damage
  • Floods
  • Potomac River
  • Real Estate
  • Rivers

Readers

  • Business Analytics
  • Hydrologic Risk Analysis and Mitigation.
  • Life Cycle Cost Analysis