ORBITAL FUEL CELL.

Abstract

During the fourth quarter of the program, most of the fabrication was completed for the modules. The electrical controls have either been completed or checked out prior to packaging. Most module components have been received and are being acceptance tested with the remaining components due to be delivered during July 1967. A problem has occurred regarding the coating of manifold holes which is expected to cause a delay of approximately one month before assembly of the modules. All cell development and performance tests have been completed.(Author)

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1967
Accession Number
AD0818293

Entities

People

  • R. J. Chesner

Tags

DTIC Thesaurus Topics

  • Assembly
  • Cells
  • Fabrication
  • Fuel Cells
  • Packaging
  • Performance Tests

Readers

  • Clinical Trial Research.
  • Software Engineering

Technology Areas

  • Biotechnology
  • Space