ORBITAL FUEL CELL.
Abstract
During the fourth quarter of the program, most of the fabrication was completed for the modules. The electrical controls have either been completed or checked out prior to packaging. Most module components have been received and are being acceptance tested with the remaining components due to be delivered during July 1967. A problem has occurred regarding the coating of manifold holes which is expected to cause a delay of approximately one month before assembly of the modules. All cell development and performance tests have been completed.(Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1967
- Accession Number
- AD0818293
Entities
People
- R. J. Chesner