EXOSKELETON PROTOTYPE PROJECT.
Abstract
Contents: Technical Requirements; Leg Velocity Studies; Safety Check List; Nyplot Program; MLINKS Program; Effect of Compliance on Clearance; Slave Actuator Design Procedure; Hydraulic Signalling Accuracy and Endurance Test; Hydraulic Position Signalling; and Concept Layout of Exoskeleton.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 28, 1966
- Accession Number
- AD0820306
Entities
Organizations
- General Electric