FACTORY ACCEPTANCE TESTING OF MISSILE 130D.

Abstract

This report presents the results of composite tests, Project Mercury, conducted 7 March 1963, and subsequent post-composite testing. Pertinent systems level testing is also included. Final acceptance of Missile 130D was based on successful performance of all missile systems in accordance with Missile Composite Checkout Procedure, and Missile Factory Acceptance Test Plan and Test Evaluation. Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 15, 1963
Accession Number
AD0829104

Entities

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptance Tests
  • Checkout Procedures
  • Composite Materials
  • Test And Evaluation

Readers

  • Aerospace Test and Evaluation
  • Psychometric Testing or Psychological Assessment.