INTEGRATION, ASSEMBLY AND CHECKOUT PLAN FOR LARGE PAYLOAD TEST VEHICLE PROGRAM,

Abstract

The purpose of this plan is to define the field considerations associated with construction, installation, activation, system checkout, test management and operation of launching facilities for development and operational flights of the Large Payload Test Vehicle.

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1965
Accession Number
AD0829271

Entities

People

  • L. N. Golding

Tags

DTIC Thesaurus Topics

  • Assembly
  • Construction
  • Test Management
  • Test Vehicles
  • Vehicles

Readers

  • Aerospace Test and Evaluation
  • Systems Analysis and Design