INTEGRATION, ASSEMBLY AND CHECKOUT PLAN FOR LARGE PAYLOAD TEST VEHICLE PROGRAM,
Abstract
The purpose of this plan is to define the field considerations associated with construction, installation, activation, system checkout, test management and operation of launching facilities for development and operational flights of the Large Payload Test Vehicle.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 1965
- Accession Number
- AD0829271
Entities
People
- L. N. Golding