INTEGRATED SUPPORT PLAN.

Abstract

This Integrated Support Plan defines the concept, policy, and specific requirements essential to the definition, acquisition, and operation of an effective support system for the Large Payload Test Vehicle (LPTV).

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1965
Accession Number
AD0829272

Tags

DTIC Thesaurus Topics

  • Acquisition
  • Test Vehicles

Readers

  • Logistics and Supply Chain Management.
  • Software Engineering