CHECKOUT AND VALIDATION, GROUND/AIRBORNE PNEUMATIC SYSTEMS,
Abstract
The purpose of this test is to determine that the ground and airborne pressurization systems will function properly to pressurize the fuel and L02 tanks before and during firing of the missile. The test will consist of conducting a 'blow-down' operation by pressurizing the fuel and L02 tank simulation ullage tanks in the manner which the missile fuel and L02 tank will be pressurized to and during firing. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 31, 1958
- Accession Number
- AD0830090
Entities
People
- E. J. Hecker
Organizations
- General Dynamics