COMPLEX 576A (65-1), LAUNCH COMPLEX AND MISSILE ASSEMBLY BUILDING, SYSTEMS INTEGRATION, ACCEPTANCE TESTING AND TEST PROCEDURE REQUIREMENTS. ENGINEERING SCHEDULE D/IOC 8.0.2 AND 8.0.3
Abstract
The enclosures supersede all previous schedules and are the official engineering schedule for Integration Testing of GSE and Facility Equipment installation at the Launch Complex and the Missile Assembly Building of 576A (65-1). The schedules reflected are based upon the weekly status report per integrated test plan.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 31, 1959
- Accession Number
- AD0830216
Entities
Organizations
- General Dynamics