COMPLEX 576A (65-1), LAUNCH COMPLEX AND MISSILE ASSEMBLY BUILDING, SYSTEMS INTEGRATION, ACCEPTANCE TESTING AND TEST PROCEDURE REQUIREMENTS. ENGINEERING SCHEDULE D/IOC 8.0.2 AND 8.0.3

Abstract

The enclosures supersede all previous schedules and are the official engineering schedule for Integration Testing of GSE and Facility Equipment installation at the Launch Complex and the Missile Assembly Building of 576A (65-1). The schedules reflected are based upon the weekly status report per integrated test plan.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1959
Accession Number
AD0830216

Entities

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Assembly
  • Checkout Procedures
  • Control Systems
  • Engineering
  • Ground Support
  • Guided Missile Components
  • Guided Missiles
  • Launching Sites
  • Plastic Explosives
  • Software Testing
  • Systems Engineering
  • Two Dimensional
  • Visual Inspection

Readers

  • Missile Defense Systems.
  • Naval Engineering and Maritime Security
  • Software Engineering