FACTORY ACCEPTANCE TESTING OF MISSILE 7C,

Abstract

This report presents results of Missile Composite Systems Test FC-3C0-02A-07, performed 6 December 1958 on Missile 7C in the factory. This was the first missile to be checked out in accordance with Procedure 7-94090. Countdown and completed data sheets from this procedure are included as Appendix A in this report. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 18, 1958
Accession Number
AD0830529

Entities

People

  • A. B. Yanke

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Composite Materials

Readers

  • Business Analytics
  • Software Engineering