FACTORY ACCEPTANCE TESTING OF MISSILE 7C,
Abstract
This report presents results of Missile Composite Systems Test FC-3C0-02A-07, performed 6 December 1958 on Missile 7C in the factory. This was the first missile to be checked out in accordance with Procedure 7-94090. Countdown and completed data sheets from this procedure are included as Appendix A in this report. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 18, 1958
- Accession Number
- AD0830529
Entities
People
- A. B. Yanke
Organizations
- General Dynamics