FUNCTIONAL VALIDATION PROCEDURE FOR INTERCOM AND P.A. SYSTEM SYCAMORE, S-1 AND S-2,
Abstract
The report contains a systematic method for functionally validating the Intercom and P.A. System for Sycamore. The point to point communication possibilities between the communications console and all areas are complete. All methods of connecting existing lines to the conference networks are utilized. The system is checked in its entirety. The P.A. System is checked from all microphone points and at all speaker locations. A thorough check is incorporated to determine that the Intercom System does not interfere with the instrumentation recorders. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 22, 1958
- Accession Number
- AD0830532
Entities
People
- P. Gad
Organizations
- General Dynamics