CHECKOUT AND VALIDATION, GROUND/AIRBORNE PNEUMATIC SYSTEMS,

Abstract

The purpose of the test is to determine that the ground and airborne pressurization systems will function properly to pressurize the fuel and LO2 tanks before and during firing of the missile. The test consists of conducting a 'blow-down' operation by pressurizing the fuel and LO2 tank simulation ullage tanks in the manner which the missile fuel and LO2 tank will be pressurized to and during firing. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 29, 1959
Accession Number
AD0830546

Entities

People

  • L. Fraunfelder

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Airborne
  • Pressurization
  • Simulations

Readers

  • Aerospace Test and Evaluation
  • Rocket Propulsion.