VALIDATION PROCEDURE FOR THE FACILITY POWER CONTROL SYSTEM (ELECTRICAL) 'D' SERIES R AND D SYCAMORE S-2,
Abstract
This manual provides instructions for validating the Facility Power Control System (Electrical), 'D' Series, R and D Sites. The procedure determines that the electrical control equipment and circuitry of the Facility Power Control System is functioning correctly and properly connected. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 26, 1958
- Accession Number
- AD0830549
Entities
People
- A. L. Eggert
Organizations
- General Dynamics