VALIDATION PROCEDURE FOR THE TEST CONDUCTORS LAUNCH CONTROL SYSTEM (ELECTRICAL) 'D' SERIES R AND D SYCAMORE S-1 AND S-2,
Abstract
This manual provides instructions for validating the Test Conductors Launch Control System (Electrical) 'D' Series R and D, at the Sycamore S-1 and S-2 Sites. The procedure determines that the electrical control equipment and circuitry of the Test Conductors Launch Control System is functioning correctly and properly connected. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 13, 1958
- Accession Number
- AD0830559
Entities
People
- A. L. Eggert
Organizations
- General Dynamics