LO2 TANKING TEST PROCEDURE.
Abstract
The objective of this Florida Test Procedure is to check LO2 system temperatures and level control by filling the missile LO2 tank. This includes the following phases: (1) Chill down facility LO2 fill line. (2) Fill missile to prescribed level. (3) Checkout subcooled topping system.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 07, 1959
- Accession Number
- AD0830561
Entities
Organizations
- General Dynamics