LO2 TANKING TEST PROCEDURE.

Abstract

The objective of this Florida Test Procedure is to check LO2 system temperatures and level control by filling the missile LO2 tank. This includes the following phases: (1) Chill down facility LO2 fill line. (2) Fill missile to prescribed level. (3) Checkout subcooled topping system.

Document Details

Document Type
Technical Report
Publication Date
Oct 07, 1959
Accession Number
AD0830561

Entities

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

Readers

  • Materials Science
  • Software Engineering