CONTRACT END ITEM DETAIL SPECIFICATION. PART I. PERFORMANCE/DESIGN AND QUALIFICATION REQUIREMENTS AIR CONDITIONING SYSTEM, PAYLOAD FAIRING.

Abstract

The Payload Fairing Air Conditioning System (PLF A/C) comprises the generating units and distribution network terminating at the interface connections with the Payload Fairing Conditioned Air Umbilical and Disconnect System. This report presents the performance/design requirements. The equipment configuration of the PLF A/C System shall include, but not be limited to, the following items: (a) Water Chillers/Condensers, (b) Cooling Towers, (c) Air Conditioning Units, (d) Chilled and Condenser Water Pumps, (e) Water Piping System, (f) Air Distribution System, (g) Control System. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 16, 1968
Accession Number
AD0830869

Entities

Organizations

  • Martin Marietta

Tags

DTIC Thesaurus Topics

  • Air Conditioning
  • Contracts
  • Control Systems
  • Cooling
  • Cooling Towers
  • End Items
  • Piping Systems
  • Pumps
  • Qualifications
  • Specifications
  • Water Pumps

Fields of Study

  • Engineering

Readers

  • Aerospace Engineering
  • Energy Conservation and Renewable Energy Engineering.
  • Materials Science