'D' SERIES (PN) 7-43040 ALIGNMENT PROCEDURE (FUEL/LO2 RATIO VALVE).
Abstract
The field test procedure is designed to be used in the alignment of the propellant utilization valve with the missile in the vertical position. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 14, 1959
- Accession Number
- AD0830945
Entities
Organizations
- General Dynamics