'D' SERIES (PN) 7-43040 ALIGNMENT PROCEDURE (FUEL/LO2 RATIO VALVE).

Abstract

The field test procedure is designed to be used in the alignment of the propellant utilization valve with the missile in the vertical position. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 14, 1959
Accession Number
AD0830945

Entities

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Energetic Materials
  • Field Tests
  • Propellants

Fields of Study

  • Physics