GUIDE FOR SHIELDED ENCLOSURE CONSTRUCTION PROBLEMS.
Abstract
This technical note has been prepared by the Naval Civil Engineering Laboratory as a guide for naval facility personnel involved in contracting, inspecting, and supervising the construction and performance testing of electromagnetic shielded enclosures. It is the aim of this guide to point out areas of difficulty which have occurred repeatedly in the construction and testing of shielded rooms so that the necessary precautions may be taken to minimize or prevent the reoccurrence of such problems. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 30, 1967
- Accession Number
- AD0831828
Entities
Organizations
- Naval Facilities Engineering Service Center