L02 RELIEF AND SHUTOFF VALVE, PRESSURE SENSITIVE CONTROLLER, AND DIFFERENTIAL PRESSURE SWITCH CHECKOUT AND 'END TO END' CALIBRATION OF THE LOP MISSILE FUEL AND L02 PRESSURE METERS, COMPLEX 576-A,
Abstract
The document provides a procedure for the functional checkout of the Liquid Oxygen Relief and Shut-Off Valve, Pressure Sensitive Controller, and the Differential Pressure Switch after the Missile is erected in the tower and connected to Launch Control Circuitry. In addition, a procedure for the 'end to end' of the L02 and Fuel Tank Pressure Meters is provided. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 23, 1959
- Accession Number
- AD0832298
Entities
People
- G. Dekker
Organizations
- General Dynamics