COMPLEX 65-1 PRESSURIZATION CONTROL UNIT PERIODIC VALIDATION PROCEDURE,
Abstract
This procedure provides the test sequence required to establish that the Pressurization Control Unit (PCU) is in a satisfactory operating condition for ground pressurization of the Missile Fuel and LO2 Tanks. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 02, 1959
- Accession Number
- AD0832470
Entities
People
- D. Farrell
Organizations
- General Dynamics