ACCESS TO LOWER LAUNCH TUBE THRU WORK PLATFORM - DESIGN CRITERIA AND TRADE STUDY,

Abstract

A need has been established for a work platform to be temporarily installed around the missile after the missile has been emplaced in the launch tube. A supplementary requirement for the work platform is that the portable staging be usable with the work platform emplaced. The function of this trade study is to determine the feasibility of an opening in the work platform in order that the work cage may be used simultaneously with the work platform. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 18, 1960
Accession Number
AD0832533

Entities

People

  • P. Snowberger
  • R. Jason Jones

Organizations

  • Boeing

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Launch Tubes
  • Platforms

Fields of Study

  • Engineering

Readers

  • Distributed Systems and Data Platform Development
  • Groundwater Contamination Remediation.
  • Software Engineering