MSTS TEST REPORT: TESTS 95-404 THROUGH 411, B4, C4-S1.

Abstract

Test 95-411-C4-S1 was an IOC integrated propellant loading test with a total elapsed, time from fuel load start to the end of LO2 tanking, of 12.57 minutes. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jul 07, 1959
Accession Number
AD0832671

Entities

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Energetic Materials
  • Propellants

Fields of Study

  • Physics

Readers

  • Game Theory.
  • Mathematics or Statistics
  • Naval Mine Countermeasure Systems Development.