MSTS TEST REPORT: TESTS 95-404 THROUGH 411, B4, C4-S1.
Abstract
Test 95-411-C4-S1 was an IOC integrated propellant loading test with a total elapsed, time from fuel load start to the end of LO2 tanking, of 12.57 minutes. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 07, 1959
- Accession Number
- AD0832671
Entities
Organizations
- General Dynamics