The purpose of this document is to establish test requirements for pre-production (qualification) testing of the purge system local control box and the purge system electrical control unit. The basic intent of these tests is to determine that the equipment functions properly when subjected to environmental test conditions simulating actual conditions of transportation, handling and use. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 25, 1959
Accession Number
AD0833195

Entities

People

  • W. R. Beye

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Control Panels
  • Environmental Tests
  • Production
  • Qualifications
  • Transportation