PRE-PRODUCTION (QUALIFICATION) TEST REQUIREMENTS PURGE SYSTEM LOCAL CONTROL BOX AND ELECTRICAL CONTROL UNIT FOR ATLAS 'D' IOC,
Abstract
The purpose of this document is to establish test requirements for pre-production (qualification) testing of the purge system local control box and the purge system electrical control unit. The basic intent of these tests is to determine that the equipment functions properly when subjected to environmental test conditions simulating actual conditions of transportation, handling and use. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 25, 1959
- Accession Number
- AD0833195
Entities
People
- W. R. Beye
Organizations
- General Dynamics