PRE-PRODUCTION TEST REPORT FOR SIGNAL CONDITIONER AND POWER CONTROL UNIT - MISSILEBORNE IOC,
Abstract
The purpose of this report is to describe the test equipment and procedure required for the pre-production testing of the missileborne IOC signal conditioner and power control unit. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 12, 1959
- Accession Number
- AD0833210
Entities
People
- J. A. Courtright
Organizations
- General Dynamics