FUNCTIONAL CHECKOUT, POWER PACKAGE ASSEMBLY, HYDRAULIC, (CENTAUR), MODEL 55,
Abstract
This report covers the requirements for the individual checkout procedure of a Hydraulic Power Package Assembly. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 18, 1959
- Accession Number
- AD0833212
Entities
People
- W. Clarke
Organizations
- General Dynamics