PRE-PRODUCTION TEST REPORT FOR VALVE ASSEMBLY-FILL AND DRAIN, HYDROCARBON FUEL, HIGH RATE, GROUND TO MISSILE, DWG. NO. 27-02101,
Abstract
The original intent of this report was to evaluate all test parameters required for acceptability of a fuel fill-and-drain valve assembly. However, due to specimen failures, the report contains only three types of tests: (a) operating vibration tests, (b) life cycle tests, and (c) pressure drop and flutter tests.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 26, 1959
- Accession Number
- AD0833321
Entities
People
- D. E. Lawrence
Organizations
- General Dynamics