PRE-PRODUCTION TEST REPORT FOR VALVE ASSEMBLY-FILL AND DRAIN, HYDROCARBON FUEL, HIGH RATE, GROUND TO MISSILE, DWG. NO. 27-02101,

Abstract

The original intent of this report was to evaluate all test parameters required for acceptability of a fuel fill-and-drain valve assembly. However, due to specimen failures, the report contains only three types of tests: (a) operating vibration tests, (b) life cycle tests, and (c) pressure drop and flutter tests.

Document Details

Document Type
Technical Report
Publication Date
Sep 26, 1959
Accession Number
AD0833321

Entities

People

  • D. E. Lawrence

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Acceptability
  • Assembly
  • Assembly Lines
  • Cycles
  • Hydrocarbon Fuels
  • Hydrocarbons
  • Life Cycles
  • Manufacturing
  • Mass Production
  • Production
  • Vibration

Readers

  • Internal Combustion Engine (ICE) Technology.
  • Materials Science
  • Software Engineering