INVESTIGATION OF SPGG HEATER CONTROL CIRCUITRY,
Abstract
The objective of the tests performed was to determine if the relay circuitry of the SPGG Heater Control will effect (1) automatic operation during a normal heating cycle and (2) permanent shut-down during an overheat (thermostat malfunction) condition. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 16, 1960
- Accession Number
- AD0833948
Entities
People
- J. B. Cross
Organizations
- General Dynamics