PRE-PRODUCTION TEST REPORT FOR LIQUID OXYGEN FILL AND DRAIN VALVE ASSEMBLY DWG. NO. 27-02102,
Abstract
The report includes the procedure and results of the pre-production testing of the liquid oxygen fill and drain valve assembly. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 10, 1959
- Accession Number
- AD0833970
Entities
People
- W. M. Thomas
Organizations
- General Dynamics