PRE-PRODUCTION TEST REPORT FOR PUMP, FIXED DISPLACEMENT, VERNIER SOLO STAGE, 'D' MISSILE APS BACKUP DWG. NO. 97-08300-001,
Abstract
Pre-production tests were performed on the vernier solo hydraulic pump to determine its operating characteristics under various environments. The pump was operated (1) at prescribed temperatures and operating conditions and (2) immediately after exposure to vibration, shock and salt atmosphere. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 20, 1959
- Accession Number
- AD0834035
Entities
People
- E. L. Jeffers
Organizations
- General Dynamics