ENGINEERING EVALUATION TEST PLAN MISSILE 30D.
Abstract
The test plan presented herein details the equipment required, the operations necessary, and the schedule for conducting the integration of the AIG into the missile system, evaluation and compatibility testing of the complete missile and ground support equipment. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 15, 1959
- Accession Number
- AD0835580
Entities
Organizations
- General Dynamics