RELIABILITY STUDIES FOR ADVANCED INTEGRATED CIRCUITS ENGINEERING CHANGE 'A'.

Abstract

The purpose of this phase of the study was to establish procedures, applicable to dielectric isolated integrated circuits, which will screen out potentially unreliable devices from a production lot. In this program the results of a 2000-hour, 175-milliwatt dissipation, 125C ambient operating life test were used to determine the effectiveness of various sequences of environmental tests and examinations as screens. The tests and examinations investigated were visual examinations, high temperature storage, temperature cycling, centrifuge data at ambient temperature recorded at 25C, -55C and 125C at various intervals. The results of tests confirmed the findings of the previous phase of this program. No failure modes which could be attributed to the dielectric isolation process (EPIC) were detected in significant portions. The most effective screen was found to be burn-in at 125C. Other screens which did produce failures were temperature cycle, dye penetrant seal integrity tests and high temperature storage. A detailed screening procedure is found in Section 4.0. There is also some evidence to suggest that special precap visual inspection criteria are desirable for EPIC circuitry. These are also presented in Section 4.0. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1968
Accession Number
AD0835860

Entities

People

  • K. Robert Mackenzie
  • Marvin R. Carpenter

Organizations

  • Motorola Mobility

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Circuits
  • Engineering
  • Environmental Tests
  • Failure Mode And Effect Analysis
  • High Temperature
  • Inspection
  • Integrated Circuits
  • Life Tests
  • Reliability
  • Visual Inspection

Readers

  • Molecular Genetics
  • Polymer Science and Engineering.
  • Software Engineering