PRODUCTION ENGINEERING MEASURE FOR SUBMINIATURE HIGH-RELIABILITY CERAMIC CAPACITORS.
Abstract
Phase II accelerated life test is discussed. The 1,000-hour readout point was achieved during this quarter. Twenty-nine additional failures were found. The analyses of the failures is described and a probable cause is presented. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1968
- Accession Number
- AD0837280
Entities
People
- H. F. Phillips
- M. Gerolulo
Organizations
- Sprague Electric