HYDRAULIC PLUMBING FOR ADVANCED AEROSPACE VEHICLES.
Abstract
The previous quarterly reports described the program, its goals, and the plans designed to meet these goals, as well as outlining the progress made in investigating problem areas and enumerating the items of hardware fabricated for exploring these problem areas. This report concentrates on presenting and evaluating the test data accumulated during Phase II Part II component testing as well as submitting process specifications for brazing permanent joints, for assembling detachable joints, and for bending tubing. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 31, 1968
- Accession Number
- AD0837295