PRE-PRODUCTION TEST REPORT FOR LIQUID OXYGEN SUPPLY LINE BELLOWS 8 IN. DWG. NO. 27-72274,

Abstract

The purpose of this report is to describe the test equipment and procedure required for the Pre-Production Testing of a liquid oxygen supply line bellows. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 16, 1960
Accession Number
AD0841901

Entities

People

  • C. A. Palosaari

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Cryogenic Propellants
  • Energetic Materials
  • Liquid Oxygen
  • Liquid Propellants
  • Liquid Rocket Propellants
  • Production
  • Test Equipment

Readers

  • Aerospace Test and Evaluation
  • Structural Dynamics.