PRE-PRODUCTION TEST REPORT FOR LIQUID OXYGEN SUPPLY LINE BELLOWS 8 IN. DWG. NO. 27-72274,
Abstract
The purpose of this report is to describe the test equipment and procedure required for the Pre-Production Testing of a liquid oxygen supply line bellows. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 16, 1960
- Accession Number
- AD0841901
Entities
People
- C. A. Palosaari
Organizations
- General Dynamics