PRE-PRODUCTION TEST REPORT FOR SIGNAL CONDITIONER AND POWER CONTROL UNIT, MISSILEBORNE, IOC DWG. NO. 27-11008-807, SPEC. NO. 27-01201-E,
Abstract
The purpose of the report is to describe the test equipment and environmental test procedure required for the pre-production testing of the missileborne signal conditioner and power control unit. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 05, 1960
- Accession Number
- AD0842113
Entities
People
- P. Thornton
Organizations
- General Dynamics