PRODUCTION EVALUATION TEST RESULTS FOR VALVE-CHECK, PURGE, VERNIER ENGINE, DWG. NO. 27-02111,

Abstract

The purpose of this report is to describe the test equipment and procedure required for the Production Evaluation testing of components in accordance with the individual component specification. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 17, 1960
Accession Number
AD0842124

Entities

People

  • R. B. Dillard

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Production
  • Test And Evaluation
  • Test Equipment

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation