PRODUCTION EVALUATION TEST REPORT FOR VALVE ASSEMBLY, EXPLOSIVE, DWG. NO. 27-08580-5,

Abstract

The purpose of this report is to describe the test equipment and procedure required for the production evaluation testing of an explosive valve. (Author)

Document Details

Document Type
Technical Report
Publication Date
Apr 07, 1960
Accession Number
AD0842163

Entities

People

  • Robert L. Johnson

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Assembly
  • Explosives
  • Manufacturing
  • Mass Production
  • Production
  • Test And Evaluation
  • Test Equipment

Readers

  • Aerospace Test and Evaluation