Pre-Production and Initial Production Evaluation Test Report for Valve - Orifice Check, Vernier Fuel, Dwg. No. 27-02402-3.
Abstract
Pre-Production and the Initial Production Evaluation Tests were performed on a vernier fuel check valve. The applicable tests in this procedure are as follows: Temperature - altitude - humidity; Operating vibration test; Life test; Proof pressure test; Burst pressure test. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 28, 1960
- Accession Number
- AD0842727
Entities
People
- L. E. Grimes
Organizations
- General Dynamics