Centaur Second Stage Component Acceptance Procedure Time Control Assembly.
Abstract
This report provides a test sequence for determining the ability of the Time Control Assembly to meet engineering requirements and specifications. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 10, 1960
- Accession Number
- AD0842778
Entities
People
- D. W. Short
Organizations
- General Dynamics