Fuel Fill Line Pressure Evaluation Test CVA No. 27-21101-3.
Abstract
The objective of the test was to evaluate the structural integrity of the fuel fill line assembly. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 16, 1960
- Accession Number
- AD0842781
Entities
People
- H. Brittain
Organizations
- General Dynamics