Centaur First Stage Component Acceptance Procedure Control Assy - Explosive Bolts.
Abstract
The document provides a test sequence for determining the ability of the control assy- explosive bolts, 55-64512, to meet engineering requirements and specifications. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1960
- Accession Number
- AD0842784
Entities
People
- D. Short
Organizations
- General Dynamics