Electrical Connector, Separation Force, Evaluation Test.
Abstract
The object of the test was to determine the forces required to unlock and disengage two electrical connectors. The connectors form a part of the electrical disconnect system between the Atlas and Centaur missile stages. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 14, 1960
- Accession Number
- AD0842799
Entities
People
- L. R. Hughey
Organizations
- General Dynamics