Pre-Production and Initial Production Evaluation Test Report for Valve-Check, 1 Inch Airborne Liquid Oxygen MA3, Drawing No. 27-02405-1,
Abstract
The purpose of this report is to describe the test equipment and procedure required for the Pre-Production Testing of one inch, airborne, liquid oxygen check valve. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 10, 1960
- Accession Number
- AD0842803
Entities
People
- L. E. Grimes
Organizations
- General Dynamics