Control of Chilldown and Pressure Rise in SF-1 Cruiser Tank and Transfer Line.
Abstract
The objective of this test is to establish an optimum chilldown procedure for the SF-1 Transfer Line and Cruiser Tank, utilizing a minimum amount of SF-1 and the minimum time without exceeding the safe missile fuel tank operating pressure (11 psig) and boiloff valve capability. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 03, 1961
- Accession Number
- AD0843161
Entities
People
- S. Tengan
Organizations
- General Dynamics