Control of Chilldown and Pressure Rise in SF-1 Cruiser Tank and Transfer Line.

Abstract

The objective of this test is to establish an optimum chilldown procedure for the SF-1 Transfer Line and Cruiser Tank, utilizing a minimum amount of SF-1 and the minimum time without exceeding the safe missile fuel tank operating pressure (11 psig) and boiloff valve capability. (Author)

Document Details

Document Type
Technical Report
Publication Date
Apr 03, 1961
Accession Number
AD0843161

Entities

People

  • S. Tengan

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Fuel Tanks

Readers

  • Combustion and Flow Dynamics.
  • Irregular Warfare and Special Operations Cyberspace Operations against Adversarial Threats.
  • Rocket Propulsion.