Pre-Production Test Report for Signal Conditioner and Power Control Unit, Missileborne, Spec. No. 27-01203 (Rev. 'A') Dwg. No. 27-12360-801, Dwg. No. 27-12375-1.

Abstract

The test specimen, signal conditioner and power control unit, was subjected to Pre-Production Tests in accordance with the test procedure of this report.

Document Details

Document Type
Technical Report
Publication Date
Nov 29, 1960
Accession Number
AD0843172

Entities

People

  • P. L. Thornton

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Production

Readers

  • Aerospace Test and Evaluation